This addendum forms part of the Contract Documents and modifies the original specifications and drawings dated June, 1981 and Addendum #2 dated January 8, 1982.
The following drawings are voided:
DRAWING NUMBER | TITLE OF DRAWING |
---|---|
S-1 | STRUCTURAL DETAILS |
13 | FLOOR PLANS & ROOM FINISH SCHEDULE |
17 | ELEVATIONS OF STOREROOM & COUNTER DETAILS |
18 | FIRST FLOOR STORAGE ROOM ELEVATION & DETAILS |
19 | STAIR DETAILS |
112 | STAIR SECTION |
238 | ELEVATIONS OF STOREROOM & FULL SCALE DETAILS |
239 | FRONT ENTRANCE D-101 |
240 | DOOR SCHEDULE & DETAILS |
241 | DRAWERS & REGISTER DETAILS |
242 | FULL SCALE DETAILS |
The following drawings are to be added to the set:
DRAWING NUMBER | TITLE OF DRAWING |
---|---|
S-2 | STRUCTURAL DETAILS |
20 | FLOOR PLANS & ROOM FINISH SCHEDULE |
21 | ELEVATION OF STOREROOM & COUNTER DETAILS |
22 | FIRST FLOOR STORAGE ROOM ELEVATION & DETAILS |
23 | ELEVATION OF STOREROOM & FULL SCALE DETAILS |
113 | STAIR DETAILS |
114 | STAIR SECTION |
115 | FRONT ENTRANCE D-101 |
245 | DOOR SCHEDULE & DETAILS |
246 | DRAWERS & REGISTER DETAILS |
247 | FULL SCALE DETAILS |
248 | FULL SCALE SHELVING DETAILS |
DIVISION 1 - GENERAL REQUIREMENTS | No Revision |
DIVISION 2 - SITE WORK | No Revision |
DIVISION 3 - CONCRETE | No Revision |
DIVISION 4 - MASONRY | No Revision |
DIVISION 5 - METALS | No Revision |
DIVISION 6 - CARPENTRY | A2 - 6.1 - 6.2 |
DIVISION 7 - MOISTURE PROTECTION | No Revision |
DIVISION 8 - DOORS, WINDOWS & GLASS | A2 - 8.1 |
DIVISION 9 - FINISHES | A2 - 9.1 |
DIVISION 10 - SPECIALTIES | Omitted |
DIVISION 11 - EQUIPMENT | No Revision |
DIVISION 12 - FURNISHINGS | No Revision |
DIVISION 13- SPECIAL CONSTRUCTION | Omitted |
DIVISION 14 - CONVEYING EQUIPMENT | Omitted |
SCOPE OF WORK:
FIRST FLOOR INTERIOR:
SECOND FLOOR & BASEMENT INTERIOR:
EXTERIOR:
1 pair | CWF F-3 H&L hinges 7 7/8" |
1 pair | CWF F-17 7 ½" & CWF F-14. |
SURFACE | APPLICATION |
---|---|
Exterior: | |
wood treads, risers and porch floor | 1 coat clear sealer |
woodwork - existing | 1 coat Martin-Senour Bright Life |
woodwork - new | 1 prime coat and 2 coats of Martin-Senour Bright Life |
metal work | 1 coat rust preventative and 2 coats Martin-Senour Great Life. |
Interior: | |
basement masonry walls | 2 coats masonry paint |
plaster | 2 coats simulated whitewash |
exposed duct work, pipe work and pipe covering | 1 prime coat and 1 coat Martin-Senour Home Decorator |
first floor existing and new doors, windows, door and window trim, chair board, baseboard, corner board, wall sheathing and stair stringer | 1 coat simulated whitewash |
A2 - 9.2 | |
first floor store fixtures: shelves, counters, packing crates, suspended shelf and cash register cabinets | No finish |
floors, treads and risers | see SECTION 6B |
All other existing woodwork | 2 coats Martin-Senour Bright Life |
All other new woodwork | 1 prime coat and 2 coats Martin-Senour Bright Life |
THE COLONIAL WILLIAMSBURG FOUNDATION
WILLIAMSBURG, VIRGINIA
JANUARY 8, 1982
This addendum forms part of the Contract Documents and modifies the original specifications and drawings dated June, 1981. Acknowledge receipt of this Addendum on your bid. Failure to do so may subject bidder to disqualification.
DIVISION 1 - GENERAL REQUIREMENTS | No Revision |
DIVISION 2 - SITE WORK | No Revision |
DIVISION 3 - CONCRETE | Omitted |
DIVISION 4 - MASONRY | A1 - 4. 1 |
DIVISION 5 - METALS | A1 - 5. 1 |
DIVISION 6 - CARPENTRY | A1 - 6.1 - 6.2 |
DIVISION 7 - MOISTURE PROTECTION | No Revision |
DIVISION 8 - DOORS, WINDOWS & GLASS | A1 - 8.1 - 8.2 |
DIVISION 9 - FINISHES | A1 - 9. 1 |
DIVISION 10 - SPECIALTIES | Omitted |
DIVISION 11 - EQUIPMENT | No Revision |
DIVISION 12 - FURNISHINGS | A1 - 12. 1 |
DIVISION 13 - SPECIAL CONSTRUCTION | Omitted |
DIVISION 14- CONVEYING EQUIPMENT | Omitted |
Section 6B, Item 2C shall read:
First floor flooring and stair treads and risers shall be quarter sawn C&Btr grade or better southern yellow pine.
Second floor flooring shall be oak to match existing.
Interior millwork shall be C&Btr or better southern yellow pine with a maximum moisture content of 12% or less unless otherwise indicated on drawings,.
Exterior trim shall be C&Btr or better southern yellow pine with a maximum moisture content of 12% or less.
Weatherboards shall be C&Btr or better southern yellow pine or clear redwood with a maximum moisture content of 12% or less.
Section 8A, Item 2B shall read:
Door 101 and cabinet doors shall be C&Btr or better southern yellow pine with a maximum of 12% moisture content or less.
Contractor shall provide 4 sets of shop drawings of all millwork for review by Architects' Office. One copy shall remain with the Colonial Williamsburg Foundation Representative. One copy shall remain with the Architects' Office. Two copies shall be stamped with appropriate action to be taken and returned to the Contractor. Contractor shall not begin fabrication or installation of said millwork until shop drawings have been released to the Contractor by the Colonial Williamsburg Foundation Representative.
Section 8B, Item 2B shall read:
All colonial type door hinges shall be fastened by rose head nails set thru leather washers. The nails shall penetrate the door and clenched, parallel to the wood grain, on opposite sides, in an established design.
The Colonial Williamsburg Foundation shall supply rose head nails A1 - 8.2 and leather washers.
THE COLONIAL WILLIAMSBURG FOUNDATION
ARCHITECTS' OFFICE
WILLIAMSBURG, VIRGINIA
Written by: JLZ October, 1980
Revised by: MJW June, 1981
DRAWING NUMBER | TITLE OF DRAWING |
---|---|
1 | STRUCTURAL DETAILS |
12 | |
13 | FLOOR PLANS & ROOM FINISH SCHEDULE |
14 | EXTERIOR ELEVATIONS |
15 | EXISTING EXTERIOR ELEVATIONS |
16 | EXISTING EXTERIOR ELEVATIONS |
17 | ELEVATIONS OF STOREROOM AND COUNTER DETAIL |
18 | FIRST FLOOR STORAGE ROOM ELEVATION AND DETAILS |
19 | STAIR DETAILS |
238 | ELEVATIONS OF STOREROOM AND F.S. DETAILS |
239 | FRONT ENTRANCE D-1 ELEVATION, SECTIONS & DETAILS |
240 | DOOR SCHEDULE & DETAILS, BOOKSHELVES |
241 | DETAILS FOR DRAWERS AND REGISTER CAGE |
242 | F.S. DETAILS |
243 | MISC. DETAILS |
This will be an A.I.A. Contract Form award. General Conditions, Supplementary General Conditions, and Special Conditions form a part of these specifications, and the work of all Sections is subject thereto.
A.I.A. payment, certification, change order forms will be used. These forms are available in the office of the Contract Administrator.
The A.I.A. General Conditions Form A201, dated September 1976, and the Colonial Williamsburg Foundation's Supplementary General Conditions can be reviewed at the Architect's Office, Goodwin Building, North Henry Street.
INDEX | PAGES | |
---|---|---|
ADDENDA (AS ISSUED) | ||
DIVISION I | - GENERAL REQUIREMENTS | |
SECTION 1A - GENERAL CONDITIONS | 1A-1 - 1A-3 | |
DIVISION 2 | - SITE WORK | |
SECTION 2A - SITE WORK | 2A-1 - 2A-2 | |
DIVISION 3 | - OMITTED | |
DIVISION 4 | - MASONRY | |
SECTION 4A - MASONRY | 4A-1 - 4A-2 | |
DIVISION 5 | - METALS | |
SECTION 5A METALS | 5A-1 - 5A-3 | |
DIVISION 6 | - CARPENTRY | |
SECTION 6A CARPENTRY | 6B-1 - 6B-3 | |
DIVISION 7 - MOISTURE PROTECTION | ||
SECTION 7A - INSULATION | 7A-1 | |
SECTION 7B - FLASHING, CAULKING AND SEALANTS | 7B-1 | |
DIVISION 8 | - DOORS, WINDOWS AND GLASS | |
SECTION 8A - DOORS AND FRAMES, WOOD AND METAL | 8A-1 | |
SECTION 8B - FINISH HARDWARE | 8B-1 - 8B-2 | |
DIVISION 9 | - FINISHES | |
SECTION 9A LATH AND PLASTER | 9A-1 - 9A-2 | |
SECTION 9B RESILIENT FLOORING | 9B-1 | |
SECTION 9C PAINTINGS & FINISHING | 9C-1 - 9C-4 |
DIVISION l0 | - OMITTED |
DIVISION 11 | |
SECTION 11A-1 - EQUIPMENT | |
DIVISION 12 | |
SECTION 12A-1 - BLINDS | |
DIVISION 13 | - OMITTED |
DIVISION 14 | - OMITTED |
SCOPE:
The purpose of these specifications and working drawings is to:
Mortar - Mortar shall match existing on exterior and be composed of 1 part white cement, 2 parts lime, 6 to 8 parts sand, carefully chosen for color to bring color of dry finish sample to match with original mortar.
Mortar for backing and unexposed work shall be 1 part PAGE 4A-2 Portland Cement, 1 part lime and 6 parts sand. Mortar that has begun its final set shall not be retempered or used in any way.
Brick and block shall be laid on a full bed of mortar covering all horizontal faces. All vertical joints shall be solidly filled. Work shall be properly bonded.
All exposed mortar joints in face brick shall be cut clean to define the edge of the bricks and shall be struck to match adjacent work.
All masonry work shall be constructed true to line and dimensions, plumb and square. All courses shall be level, with uniform joints. Wet all bricks before laying in warm weather. When masonry is first set, they shall not be removed thereafter unless relaid in fresh mortar.
Provide protection against freezing. No masonry work shall be done without the approval of the Owner's Representative when the temperature is 45° and falling. This, however, in no way relieves the Contractor from the responsibility of removing and replacing frozen work.
Clean down all new exposed masonry with 3% solution of muriatic acid, followed by two washings of clear warm water and a copious use of a stiff nonmetallic brush.
Included:
Except as otherwise noted, the materials shall be as follows: All new interior finish shall be F.A.C. Grade Yellow Poplar, or Grade C Southern Yellow Pine.
Exterior millwork shall be constructed of Southern Yellow Pine, C or better, selected clear face, except that Northern White Pine (Pinus strobus) shall be used for doors and exterior casings and special glass door cabinet in storeroom.
All items later to receive finish paint shall be primed at the shop or mill before delivery to the job with materials as specified by the Architects' Office.
Items to receive natural finish shall be primed with Cereseal or an equal substitute. Back prime all millwork.
Blanket type Kraft faced Fiberglass building insulation R-11 shall be installed in the exterior frame walls of the first floor and R-19 in the ceiling of the shed addition. Unfaced fiberglass insulation R-19 shall be installed on the attic floor.
Insulation shall be equal to Owens-Corning or Johns-Manville and installed in accordance with the manufacturer's recommendations.
Flashing around exterior openings shall be 4 oz. copper clad Sisalkraft. 16 oz. hot rolled copper shall be utilized for other flashing except the copper shall be lead coated where exposed to view.
Caulking shall be nonstaining compound of a color to match adjacent work and shall be carefully installed to produce a neat job and as obscure as possible.
Hollow metal frames shall be Ceco DWC Series, or approved equal, 16 gauge as recommended by the manufacturer. Frames shall be mortised and reinforced for hardware.
Frames to be primed with one coat of rust-inhibitive paint at the factory.
Stock cut New York galvanized nails with finish type heads shall be used on all interior work and nongalvanized for finish floors. Nails shall not be set below the finish surface and shall be driven in patterns as directed. All colonial type door hinges on doors shall be fastened by rose-head nails set thru leather washer.
PAGE 8B - 2Nail pattern, type and size shall be as directed by the Architect.
The nails shall penetrate the door and clenched, parallel to the wood grain, on opposite sides, in an established design. Leather washers for door hinges shall be manufactured by CWF.
Reuse existing doors and hardware from doors D-201, D-202, D-203, D-204, D-206 on second floor.
D-1 - 3'0" x 6'8" x 1 ¾" L.H. on H.M. frame
1 ½ pair . . . . . . . 4 ½" stock butt hinges
1 . . . . . . . . . . . . Schlage A80PD - Plymouth - Finish 626 outside, 605 inside
1 . . . . . . . . . . . . Door closure 4040H Stop Face, LCN
D-2 - 2'8" x 6'6" x 1 ¾" L.H. on H.M. frame
1 ½ pair. . . . . . 4 ½" stock butt hinges
1 . . . . . . . . . . .Schlage A53PD - Plymouth Finish 605
D-3 - 3'0" x 6'8" x 1 ¾" L.H. on H.M. frame
1 ½ pair. . . . . . 4 1/2" stock butt hinges
1 . . . . . . . . . . Schlage A80PD Plymouth - Finish 626
1 . . . . . . . . . . Door closure 4040H Stop Face, LCN
D-4 - 2'6" x 6'8" x 1 ¾" L.H. on H.M. frame
1 ½ pair . . . . . . 4 ½" stock butt hinges
1 . . . . . . . . . . Schlage A40S - Plymouth - finish 625 outside, 605 inside
D-5 - 2'8" x 6'8" x 1 ¾" R.H. on H.M. frame
1 ½ pair . . . . . . 4 ½" stock butt hinges
1 . . . . . . . . . . Schlage A53PD - Plymouth - Finish 605
D-101 -- 3'0" x 6'6" x 1 ¾" L.H. on WD frams
1 pair . . . . . CWF F-3 H&L hinges 7 7/8"
1 Ball and Ball X90-021 with XSP-011 lock
D-205 - 2'8" x 6'6" x 1 ¾" L.H. on H.M. frame
1 ½ pair . . . . . . . 4 ½" stock butt hinges
1 . . . . . . . . . . . Door closure 4040H Stop Face, LCN
1 . . . . . . . . . . . Pull #646 Modera 745NR US3 finish by Russwin
1 . . . . . . . . . . . Push #616 Modera US3 finish by Russwin
Cabinet doors first floor Store Room
2 pair . . . . . . . . . CWF F-1 H hinges 5"
2 . . . . . . . . . . . CWF F-18 3" Surface bolts
1 Ball and Ball TCB-012 lock w/LG7 escutcheon
D-2 and D-205 equipped with door mounted stops.
D-201, D-202,D-203, D-204 and D0206 to have CWF wood stops.
Windows are to have screens, locks and other modern appurtenances removed. Patch and repair as necessary. Reuse existing windows as needed. All windows to be equipped with W.I. shutter dogs to match existing. Each window with shutters shall have 1 pair W.I. H*L hinges CWF F-3, 7 7/8", 1 pair W.I. cabin hooks CWF F-21 length as required by conditions and 4 W.I. staples similar to CWF F-21. Reuse existing shutters and shutter hardware where possible.
MATERIALS AND WORKMANSHIP
Resilient flooring shall be sheet flooring as manufactured by GAF or the approved equal. Pattern shall be as selected by the Architects' Office. All exposed edges shall be trimmed as approved by Architects' Office and as shown on drawings.
Floor shall be thoroughly cleaned and properly prepared to receive the finish material.
Use adhesives as recommended by the manufacturer.
Surface | Application |
---|---|
Interior woodwork - new (Except as below) | 1 prime coat and 2 finish coats-Martin-Senour Bright Life. |
Interior woodwork - existing | 2 coats Martin-Senour Bright Life. |
Interior woodwork to receive natural finish | 1 coat Cereseal, or equal, by mill. Finish applications as later directed or as specified herein. |
All masonry interior walls of basement areas | Two coats masonry paint. |
Plaster work, new | 1 prime and 2 coats of Martin-Senour Bright Life. |
PAGE 9C-4 | |
Exposed duct work, pipe work pipe covering | 1 prime and 1 coat of Martin-Senour Home Decorator |
Exterior woodwork - new | 1 prime and 2 coats of Martin-Senour Great Life. |
Exterior woodwork - existing | 2 coats Martin-Senour Bright Life. |
Exterior metal work | 1 coat of rust preventative and 2 coats of Martin-Senour Great Life. |
Plaster work, existing | 2 coats Martin-Senour Bright Life. |
MATERIALS AND WORKMANSHIP :
Stairs shall be STAIR-SCAPE as manufactured by AUCIELLO IRON WORKS, INC., 355 Western Avenue, Boston, Massachusetts 02135 or approved equal. Operation shall be by gravity descent and spring mechanism. Type Access and Model No. A-24483 with height to be 10'2" and angle to be 72° with pull chain and ¼" plywood bottom cover.
Stairs to be installed per manufacturer's instructions (See drawings). Any blocking or modification on site to wood frame for stairs shall first be approved by Architects' Office